Next up; Figuring out the new connection between the backbone and the rear engine mount. After that it should be a smooth ride to copy al this to the other side. Hoppefully I have a full roller by the end of this summer.
maandag 4 augustus 2014
Finally some progress
Welded the lower frame tube today.
zaterdag 5 juli 2014
Beat it
Beating the seatpan in to shape. Slowly getting in to shape. In the meantime I'm also working on a mini- flakegun. No luck there yet.
dinsdag 1 juli 2014
New seat pan and frame progress
Seat will be al little bit longer en narrower. I will try to make the tuck and roll upholstery myself.
Also pre-fitted the lower frame tube. It still needs a welding tab on the bottom before welding but she's getting there.
Hopefully I can finish it up this weekend so I can start on the other side.
zaterdag 21 juni 2014
No progress this weekend
Did some maintenance on Lucy this weekend. Fresh plugs, oil, battery and some other small parts. Also rearranged te shed a little bit.
The project is still in need of some serious attention. Hopefully tomorrow or next weekend.
zaterdag 17 mei 2014
zaterdag 3 mei 2014
Welding Saturday
Welding Saturday ended a little earlier today. Out of welding gas. At least I managed to tag one of the frame tubes. Next up: welding the lower tube and of course te other side.


woensdag 16 april 2014
Fabrication time
Picked up a nice lathe last weekend. Tons of ideas running through my head.
First job; shorten the risers
Abonneren op:
Posts (Atom)